图片名称

Mobile Impact Crusher

Product Features:


Input Size:

Capacity:

Material:

Details Performance

Parameters

Maintenance

Case

Details Performance

图片名称

Optimized Impeller Enhances Efficiency By 30% And Reduces Wear By 40%

Through systematic mechanical analysis and verification,  Compared with the traditional sand makers, VSI5X Sand Maker obviously increases the material throughput and ratio of crushing, and enhances the working efficiency by 30%-60%. The wear costs of vulnerable parts reduce by more than 40%.

图片名称

Hydraulic Device to Open the Cover Automatically Reduces Maintenance Costs

In consideration of the maintenance and part replacement during the production of the sand maker, By only pressing a button, users can open the top cover of the machine to carry out following operations. So, this system greatly saves labor costs and enhances the service efficiency.

图片名称

Split-Type Structure, Extended Service Life of Spare Parts

Based on the actual situations of production, we found that some spare parts like the periphery guard board and impact block always wear terribly at some specific points. So, to avoid this phenomenon,  which not only greatly extends service life of quick-wear parts, but also reduces their using costs a lot.

图片名称

Brand New Feed Mode

In consideration that customers may have two production demands (i.e. sand making and shaping) which require the switch between central feeding and fall feeding

Parameters

Maintenance

Jaw Crusher - Installation

The jaw crusher is a large crusher installed and receives no-load testing in the manufacturer's workshop. However it is disassembled into components for transport.


Jaw crusher - Lubrication

1. To ensure normal operation and extend service life of the crusher, regular lubrication shall be performed.
2. Grease in the bearing block shall be replaced every 3 to 6 months.


Jaw Crusher - Troubleshooting

1. Movable jaw does not rotate while flywheel is rotating
2. Crushing plate shakes and makes collision noise


Crushing Production Line - Installation

Preparation before foundation concrete placement
1. Set markings for placement thickness control, for example, horizontal standard piles or elevation piles.


MORE

CASE

Granite crushing project of cone crushers in Thailand

Four HPY300 hydraulic cone crushers in Chunburi, Thailand.

MORE

PE500*750 Stone crushing line in Suriname, South America

Location: Suriname, South America 

Raw material: Granite

Capacity:50-70tph

Equipment list: ZW0730 Vibrating feeder,PE500*750、PEX250*1200*2 Jaw crusher, 

MORE

Leimeng Group's 300 ton series LDC110 crawler jaw mobile crushing station arrived at the project site in Guangzhou and successfully completed delivery.

Location: Guangzhou 

Capacity:300tph

Equipment list: LDC110 crawler jaw mobile crushing station

MORE

Submit Demands Online

You can leave your message here, we'll send you an Email immediately.